
The Palo Verde at Cholla Wash
$468,000
3 bd, 2 ba, 1,846 sq ft, Single-family
Stage 4 of 4: Move-in. Ready now.
- Lot, done
- Framing, done
- Finishes, done
- Move-in, done
New-build homes in planned communities around Phoenix, Las Vegas, San Antonio and Boise, $390K to $1.1M, each with its build stage tracked to move-in.

Stage 4 of 4: Move-in. Ready now.
Current phase news from communities in Phoenix, Las Vegas, San Antonio and Boise.
When you first see a Stackly home it’s often a staked homesite or a frame with no drywall. We help you pick the lot, sit beside you at the design studio, walk the frame with your inspector, and come back eleven months after closing for the warranty walk.
Grouped by when the builder expects them to be finished. The bar on each card shows where construction stands today.
Finished and open to walk through

Cholla Wash, Phoenix
$468,000
3 bd, 2 ba, 1,846 sq ft, Single-family
Stage 4 of 4: Move-in. Ready now.
Est. March to May 2027

Mesquite Draw, San Antonio
$458,000
4 bd, 3 ba, 2,618 sq ft, Single-family
Stage 2 of 4: Framing. Estimated move-in May 2027.
Est. June to August 2027

Mesa Crest, Phoenix
$1,095,000
5 bd, 4.5 ba, 3,880 sq ft, Single-family
Stage 1 of 4: Lot. Estimated move-in August 2027.
Four visits that matter more on a new build than on any resale.
Two homesites in one phase can differ by $15,000 in premium and a lot more in afternoon sun. We visit the ones you’re weighing around 4pm.
With your inspector and your option sheet, we check outlets, blocking and plumbing while the walls are open, and send photos that evening.
We bring recent upgrade prices from the same community and keep a running total, so your budget goes to tile, layout and anything inside a wall.
Before the first-year coverage ends, we walk the house with you and file every nail pop and sticking door with the builder.
Week one
A 30-minute call sets the city, size and price ceiling. Then we drive three or four communities with you on a Saturday.
After you sign
We read the purchase agreement with you before you sign, then join your design studio appointment with a running total.
Framing to keys
A framing walk with your inspector, a final walk with blue tape, closing, and a warranty walk in month eleven.
“At the framing walk Marisol held my option sheet up against the kitchen and saw the island had no outlet, which I'd paid $380 for. The builder added it that Thursday, before the drywall went up.”
Desmond Bellamy“We went into the design studio with a $25,000 upgrade budget on a sticky note. Renata steered it toward the tiled shower and the wider slider, and our final sheet came to $21,600.”
Harold and June Nakamura“We paid the $8,500 premium for the homesite on the canal path. At month eleven Silas found three warranty items, and the builder fixed all of them within three weeks.”
Wendy and Phil AlbrechtEach agent lives in the city they cover and represents buyers only.
Founder and Designated Broker, Phoenix
Ask me about lot premiums that earn their money back in shade and privacy.
Buyer’s Agent, Las Vegas
Ask me about what a framing walk should cover before the walls close.
Buyer’s Agent, San Antonio
Ask me about which upgrades cost less to add after closing.
Buyer’s Agent, Boise
Ask me about how completion dates are written into a builder contract.
Still wondering about something? Your agent answers within one business day.
It depends on the builder and the stage. On a finished home, earnest money is usually $5,000 to $10,000 and sits with the title company. Upgrade deposits paid at the design studio are almost always non-refundable. We go through the deposit terms with you before you sign.
Every date on this site is the builder's estimate. Slips of two to six weeks are common, from rain, inspection backlogs or late deliveries. We update the tracker the day the schedule changes, and suggest waiting for the final inspection before you book a moving truck.
After you sign, the builder books a design studio appointment. Each plan has standard finishes, and anything above them is priced item by item. Spend first on what goes inside walls or under floors, because it's the hardest to change later.
Most builders use a 1-2-10 structure: one year on workmanship and materials, two years on the plumbing, electrical and cooling systems, and ten years on major structural parts.
Yes. We recommend a private inspector before drywall and again before your final walk. In our four cities each one runs about $300 to $650.
You can, as long as we register you on your first visit to the sales center. On most new builds the builder pays our fee, and we confirm that in writing before you tour.
Tell us the city and the size you need. Your agent lines up three or four communities for one Saturday.
Every other Tuesday at 7am Arizona time: lot releases, new plans and homes that just reached framing in all four cities.
Two emails a month. Unsubscribe from any of them.
Esplanade Center, 2425 East Camelback Road, Suite 860, Phoenix, AZ 85016
Mon to Fri 8:30am to 5:30pm, Sat 9am to 4pm, Sun by appointment